Skip to main content

Primary sourcePhotograph1927–1938

Trans-Iranian Railway

Kampsax and Government of Iran · 1927–1938

A railway built across Iran from 1927 to 1938 at Reza Shah's direction, linking the Persian Gulf and Caspian Sea coasts.

Reza Shah commissioned and directed this railway as the signature project of his state-building program.

Black-and-white photograph of a man in a long military greatcoat and a tall peaked cap with a badge, standing on railway tracks at a construction site, with a group of men in hats and civilian and uniform clothing behind him.
Reza Shah at the construction site of the Trans-Iranian Railway, late 1920s.

About this source

What it is

The Trans-Iranian Railway was a major railway building project started in Pahlavi Iran in 1927 and completed in 1938. It was directed by Reza Shah and built with the Danish engineering firm Kampsax, connecting Tehran to ports on the Persian Gulf and the Caspian Sea. It is now a UNESCO World Heritage Site.

Why it matters

Unlike many infrastructure projects of the era, it was built entirely with Iran's own domestic funds rather than foreign loans, making it a symbol of Reza Shah's drive for national independence and modernization. It shows how he used large state-building projects to unify the country and reduce foreign influence.

Look closer

  • Why might Reza Shah have insisted on paying for the railway with domestic taxes instead of foreign loans?
  • What does the photograph of him at the construction site, surrounded by officials, suggest about how he wanted to be seen?
  • What parts of the country's history or people are left out of a photo focused on construction and leadership?

This photograph is part of the curated material that grounds the AI version of Reza Shah on Humy.ai — when students ask about related events, the AI can quote it and cite it.

Ready when you are

Start chatting with Reza Shah now.

20 messages free · No credit card · Available in 50+ languages.